Status of Statue of Equality – a Brief Report

Status of Statue of Equality – a Brief Report

The construction of the “Statue of Equality” is moving at a systematic pace. Construction workers, engineers, masons and others are working hard in various units and the progress of each unit is as below… Over 109 temples are being built – 108...
108 Centres of Inspiration. The rise of Divya Desams begin…

108 Centres of Inspiration. The rise of Divya Desams begin…

Out of the 106 centres of inspiration that are on this land, 11 of them have been raised above Foundation level. Chitravana, Upapeetam, Adhishtanam have beautifully shaped up mirroring the original centres! 39 of them have CRS walls being constructed. 16 of them are...