Status of Statue of Equality – a Brief Report

[et_pb_section fb_built=”1″ _builder_version=”3.24.1″][et_pb_row _builder_version=”3.25″ background_size=”initial” background_position=”top_left” background_repeat=”repeat”][et_pb_column type=”4_4″ _builder_version=”3.25″ custom_padding=”|||” custom_padding__hover=”|||”][et_pb_text _builder_version=”3.27.4″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” z_index_tablet=”500″ text_text_shadow_horizontal_length_tablet=”0px” text_text_shadow_vertical_length_tablet=”0px” text_text_shadow_blur_strength_tablet=”1px” link_text_shadow_horizontal_length_tablet=”0px” link_text_shadow_vertical_length_tablet=”0px” link_text_shadow_blur_strength_tablet=”1px” ul_text_shadow_horizontal_length_tablet=”0px” ul_text_shadow_vertical_length_tablet=”0px” ul_text_shadow_blur_strength_tablet=”1px” ol_text_shadow_horizontal_length_tablet=”0px” ol_text_shadow_vertical_length_tablet=”0px” ol_text_shadow_blur_strength_tablet=”1px” quote_text_shadow_horizontal_length_tablet=”0px” quote_text_shadow_vertical_length_tablet=”0px” quote_text_shadow_blur_strength_tablet=”1px” header_text_shadow_horizontal_length_tablet=”0px” header_text_shadow_vertical_length_tablet=”0px” header_text_shadow_blur_strength_tablet=”1px” header_2_text_shadow_horizontal_length_tablet=”0px” header_2_text_shadow_vertical_length_tablet=”0px” header_2_text_shadow_blur_strength_tablet=”1px” header_3_text_shadow_horizontal_length_tablet=”0px” header_3_text_shadow_vertical_length_tablet=”0px” header_3_text_shadow_blur_strength_tablet=”1px” header_4_text_shadow_horizontal_length_tablet=”0px” header_4_text_shadow_vertical_length_tablet=”0px” header_4_text_shadow_blur_strength_tablet=”1px” header_5_text_shadow_horizontal_length_tablet=”0px” header_5_text_shadow_vertical_length_tablet=”0px” header_5_text_shadow_blur_strength_tablet=”1px” header_6_text_shadow_horizontal_length_tablet=”0px” header_6_text_shadow_vertical_length_tablet=”0px” header_6_text_shadow_blur_strength_tablet=”1px” box_shadow_horizontal_tablet=”0px” box_shadow_vertical_tablet=”0px” box_shadow_blur_tablet=”40px” box_shadow_spread_tablet=”0px”]

The construction of the “Statue of Equality” is moving at a systematic pace. Construction workers, engineers, masons and others are working hard in various units and the progress of each unit is as below…

Over 109 temples are being built – 108 DivyaDesam temples and 1 Alwar temple.
As of April 8 2019, over 6 temples have reached 80% completion. The rest of the temples are in different stages of construction.

Vimana Gopurams :

Vimana GopuramThe Temple Gopurams form an important part of temple. 70% work has been done for the Gopurams of over 3 temples. Much work is left to do for the rest of the temples.

 

 

Main Deities:

Main DatiesSculpturing the deities’ idols have begun and the work for 9 of them is going fairly well. The pace is comparatively slow, but moving steadily under the supervision of Asst. Sthapathy.

 

Panchaloha Deities :
Panchaloha Deities9 sets are under progress. The team is ensuring speedy progress in this unit.

 

 

 

Temple Doors:
Over 33 beautiful decorative temple doors that need time and creativity have been completed. Rest are in progress.

Divya Desa Mandapa Pillars :
Divya Desa PillarsOver 458 pillars need to be built and 367 have been received with 322 already erected! Work is going well here.

 

 

Ticket Counters:
Ticket counterTicket Counters are being built for our ‘Statue of Equality’ visitors and tourists.
Over 85% pillar work is completed. And 14 out of 17 windows have been done as well.

 

 

And then we have the Food Court:
57 Pillars are needed for Food Court.Over 5 pillars have 90% of work completed. The construction of the rest of the pillars are in different stages. Likewise, over 8 windows have 70% work done. The remaining 9 windows are in different stages of construction.

Badravedi:
BhadravediOver 90% work is done in Badravedi.

USM Beam Cladding work in pending.

For a more detailed report of exact statistics, please Click here

[/et_pb_text][et_pb_button url_new_window=”on” button_text=”CLICK HERE FOR STATUS OF STATUE OF EQUALITY REPORT PHOTOS” _builder_version=”3.24.1″ box_shadow_style=”preset6″][/et_pb_button][/et_pb_column][/et_pb_row][/et_pb_section]